Checkout Procedure Schedule

This section lists the schedule of checkout procedures, and describes where each procedure is documented. Checkouts must be per-
formed as describes, and results should be recorded and kept in the appropriate place (for example, near the machine, and/or in a tech-
nical file).

Schedule of Checkouts

Checkout Procedure

When to Perform

Where to Find the Procedure

Who Must Perform the
Procedure

Trip Test

1. At Installation
2. Any time the System, the

guarded machine, or any
part of the application is
altered.

Trip Test

on page 32

Qualified Person

Commissioning Checkout

1. At Installation
2. Whenever changes are

made to the System (for
example, either a new
configuration of the EZ-
SCREEN Type 2 or
changes to the guarded
machine.

Commissioning Checkout

on page

38

Qualified Person

Shift/Daily Checkout

1. At each shift change.
2. Whenever the System is

powered up and machine
setup change.

During continuous machine run
periods, this checkout should be
performed at intervals not to ex-
ceed 24 hours.

Daily Checkout Card (Banner P/N
122450)

A copy of checkout results should be
recorded and kept in the appropriate
place (for example, near or on the
machine, in the machine's technical
file).

Designated Person or
Qualified Person

Semi-Annual Checkout

Every six months following sys-
tem installation, or whenever
changes are made to the sys-
tem (either a new configuration
fo the EZ-SCREEN Type 2 or
changes to the machine).

Semi-Annual Checkout Card (Ban-
ner P/N 122451)

A copy of checkout results should be
recorded and kept in the appropriate
place (for example, near or on the
machine, in the machine's technical
file).

Qualified Person