3 p4 cable connections – Banner PresencePLUS BCR 1.3 Series User Manual

Page 11

Advertising
background image

2.1.3 P4 Cable Connections

Note: The sensor power must be 24V dc ± 10% if a light source is powered by the sensor.

Monitor Cable (to Video Monitor, optional)

Crossover Ethernet Cable (to PC Ethernet Port)*

BNC06 —2 m (6')

STPX07 — 2.1 m (7')

BNC15 — 5 m (15')

STPX25 — 7.6 m (25')

BNC30 — 9 m (30')

or

Serial Cable (to PC serial Port)*

Standard Ethernet Cable (to PC via Network Hub
or Switch

DB9P06 — 2 m (6')

STP07 — 2.1 m (7')

DB9P15 — 5 m (15')

11

Banner Engineering Corp. - Minneapolis, MN USA - www.bannerengineering.com

Tel: 763.544.3164

P/N 000000

System Description

7/2009

Advertising
This manual is related to the following products: