Product change, 1 product change specifications, 11 product change – Banner PresencePLUS BCR 1.3 Series User Manual

Page 273

Advertising
background image

11

Product Change

This section explains the Product Change (pin 3) input.

The Product Change input is used in conjunction with one of the four I/O points programmed as Product Select lines.
The inspection loaded will be executed following a valid trigger.

• The Product Change input responds to the leading edge transition of a pulse greater than 1 millisecond.
• The Product Select input is pulsed to correspond to a program location. For example, five pulses will

load program #5.

11.1 Product Change Specifications

Current Sourcing (PNP)

Current Sinking (NPN)

State

> 8V at -7.5 mA max.

< 2V at 1 mA max.

ON

< 2V at -7.5 mA max.

> 10 V at 4 mA max.

OFF

One of the four I/O on the System Setup InputOutput tab must be programmed for Product Select if Product
Change is to be used.

273

Banner Engineering Corp. - Minneapolis, MN USA - www.bannerengineering.com

Tel: 763.544.3164

P/N 000000

Advertising
This manual is related to the following products: