3 hookups, Installation and mechanical alignment – Banner A-GAGE MINI-ARRAY Series User Manual
Page 16

Installation and Mechanical Alignment
16
Banner Engineering Corp. • Minneapolis, U.S.A.
Website: http://www.baneng.com • Tel: 888.373.6767
3.3 Hookups
Connections are made to the MACNXDN-1 and MACPXDN-1 control modules via 20
wiring terminals located along the front surface of the module. Refer to Figures 3-3
and 3-4 for the appropriate hookup information.
NOTE: The controller must be powered up before the DeviceNet connection in every
power-up situation, for proper operation.
1
2
3
4
5
6
7
8
9
10 11 12 13 14 15 D5 D4 D3 D2 D1
F1
V+
16 - 30V dc
1.2A MAX
EMITTER and
RECEIVER CABLES
10-30V dc
GATE
SIGNAL
OUTPUT 1
BR
O
W
N
V-
NC NC
+
-
BL
U
E
D
RA
IN
W
IR
E
BL
AC
K
W
H
IT
E
DEVICENET
CONNECTIONS
RE
D
W
H
IT
E
D
RA
IN
W
IR
E
BL
U
E
BL
AC
K
150mA
max.
ALARM
150mA
max.
Figure 3-3. MACNXDN-1 hookup (2 NPN discrete outputs)
1
2
3
4
5
6
7
8
9
10 11 12 13 14 15 D5 D4 D3 D2 D1
F1
V+
16 - 30V dc
1.2A max.
EMITTER and
RECEIVER CABLES
10-30V dc
GATE
SIGNAL
OUTPUT 1
BR
O
W
N
V-
NC NC
+
-
BL
U
E
D
RA
IN
W
IR
E
BL
AC
K
W
H
IT
E
DEVICENET
CONNECTIONS
RE
D
W
H
IT
E
SH
IE
LD
BL
U
E
BL
AC
K
150mA
max.
ALARM
150mA
max.
Figure 3-4. MACPXDN-1 hookup (2 PNP discrete outputs)