Checkout procedures, Solid-state 10-30v dc, Bn bl wh bu – Banner DUO-TOUCH Run Bar with STB Buttons User Manual

Page 8: Contact element 1 contact element 2

Advertising
background image

Solid-State

10-30V dc

V+

V+

bn

bl

wh

bu

Micro-

Controller

1

Micro-

Controller

2

+

Figure 7. STB Touch Button Block Diagram

Logic

STB2

+ –

STB1

+ –

Logic

Brown

Black

Black

Blue
White

White

Z1
Z2
S12
S11
S13
S22
S21
S23

AT-GM-13A
AT-HM-13A

Figure 8. Connection to Two STB Touch

Buttons with PNP Outputs

SC22-3

S1 S2 S3 S4 S5 S6 S7 S8 S9 S10

A1 A1 A2 A2

01 02 03 04 05 06 07

STB1

STB2

Brown

Black

+24 V dc

+24 V dc

0 V dc

0 V dc

Blue

White

Black

White

Figure 9. Connection of Two STB Buttons to

the Banner Safety Controller

Connection of Emergency Stop Button

For models with an E-stop button, connection of the E-stop button is made at the screw terminals on the contact element

mounted on the mounting adapter.

Screw Terminals

Figure 10. E-Stop Wiring Terminals

Contact
Element 1

Contact
Element 2

Figure 11. E-Stop Wiring Diagram

WARNING: Multiple E-Stop Switches

Whenever two or more E-stop switches are connected to the same E-stop safety module, the

contacts of both switches must be connected together in series. This series combination is then

wired to the respective safety module input. Never connect the contacts of multiple E-stop

switches in parallel to the E-stop safety module inputs; this defeats the switch contact monitoring

ability of the safety module, and creates an unsafe condition which may result in serious injury or

death.

Checkout Procedures

Checkout procedures are dependent on what two-hand control system or module is interfaced with the DUO-TOUCH Run

Bar. At minimum, the procedure should include the requirements listed in the Applications section and the following steps.

DUO-TOUCH Run Bar with STB Buttons

8

www.bannerengineering.com - tel: 763-544-3164

Datasheet 131634_web Rev.

E

Advertising
This manual is related to the following products: