Section 6: parts lists, 01 introduction, 02 ordering information – Tweco A80-A120 CutMaster User Manual

Page 83: 03 power supply replacement, Section 6, Parts lists -1, 01 introduction -1 6.02, Ordering information -1, Power supply replacement -1

Advertising
background image

CUTMASTER A80, A120

Manual 0-5119

PARTS LIST

6-1

SECTION 6:

PARTS LISTS

6.01 Introduction

A. Parts List Breakdown

The parts list provide a breakdown of all replaceable components. The parts lists are arranged as follows:

Section "6.03 Power Supply Replacement"
Section "6.04 Replacement Power Supply Parts"
Section "6.05 Options and Accessories"
Section "6.06 Torch Replacement Parts SL100SV Torch (with Solenoid on Mounting Tube)"
Section "6.07 Torch Consumable Parts (SL100)"
Section "6.08 Replacement Parts for Hand Torch"

NOTE

Parts listed without item numbers are not shown, but may be ordered by the catalog number shown.

B. Returns

If a product must be returned for service, contact your distributor. Materials returned without proper autho-

rization will not be accepted.

6.02 Ordering Information

Order replacement parts by catalog number and complete description of the part or assembly, as listed in the

parts list for each type item. Also include the model and serial number of the power supply. Address all inqui-

ries to your authorized distributor.

6.03 Power Supply Replacement

The following items are included with the replacement power supply: work cable & clamp, input power cable,

gas pressure regulator / filter, and operating manual.

Qty Description

Catalog

#

1

CutMaster A80 400VAC, Non CE Power Supply

With 400V, 3 Phase input power cable

3-1334-3

1

CutMaster A120 400VAC, Non CE Power Supply

With 400V, 3 Phase input power cable

3-1734-3

1

CutMaster A80 400VAC, CE Power Supply

With 400V, 3 Phase input power cable

3-1334-4

1

CutMaster A120 400VAC, CE Power Supply

With 400V, 3 Phase input power cable

3-1734-4

Advertising