02 cables and leads identifi cation, Pak 200 installation, 02 cables and leads identifi cation – Tweco Pak 200 User Manual

Page 28: Figure 3-1: cables identifi cation, Figure 3-2: leads identifi cation

Advertising
background image

INSTALLATION 3-2

Manual

0-5057

PAK 200

INSTALLATION

3.02 Cables and Leads Identifi cation

Refer to “Connect Input Power and System Ground Cables” on page 3-6 for ground connections and ground cables.

Primary power

Control

Cable

Ground

Cable

Work

Art # A-08376_AB

Torch

Work Cable

PAK 200

Power Supply

Arc Starter /

Gas Control Module

(GCM-200)

Pilot Return

Negative

Coolant Supply

Coolant Return

Control Cable

Torch Lead Set
- Coolant Supply w/ Negative
- Coolant Return
- Pilot Return
- Plasma Gas
- Shield Gas
- Control Cable

Maximum Length 100’ / 30.5 m

Primary Ground

Figure 3-1: Cables Identifi cation

G

Torch Lead Set

Art # A-08377_AC

Green / Yellow #4 AWG

A

Green

Red

#8 AWG Cable

#1 AWG Cable

B

C

D

E

F

K

Work Cable

37

14

Coolant Leads, Power Supply
to Arc Starter

Pilot Return, Power Supply
to Arc Starter

Negative Lead, Power Supply
to Arc Starter

Control Cable, Power Supply
to Arc Starter

Ground Cable

O

Control Cable,
Power Supply to
Gas Control Module

Green

Red

4’ / 1.3 m

#1 AWG

Figure 3-2: Leads Identifi cation