05 primary power connections, Pak 200 installation – Tweco Pak 200 User Manual
Page 30
Advertising
INSTALLATION 3-4
Manual
0-5057
PAK 200
INSTALLATION
3.05 Primary Power Connections
The primary power cable must be supplied by the end user and connected to the power supply.
Warning
Refer to local and national electrical codes for suggested cable and fuse sizes.
Remove the connections cover on the rear of the Power Supply. Use caution when removing the panel; there is a
ground wire connected to the inside of the panel. Do not disconnect this wire.
Connections Cover
(Removed)
Connection Panel
Art # A-04827
Figure 3-4: Primary Power Connections
Advertising