Pak 200 installation – Tweco Pak 200 User Manual

Page 38

Advertising
background image

INSTALLATION 3-12

Manual

0-5057

PAK 200

INSTALLATION

3.10 Connect Torch Leads to the Gas Control Module / Arc Starter

1. Remove the top cover from the Gas Control Module / Arc Starter.

2. Pass the torch leads and coolant leads through the torch leads port on the back of the module. Ensure that the

leads outer jacket slides into the port.

CAUTION

Use protective gloves when handling the leads. Do not kink or bend the leads.

3. Connect the leads to the module in the sequence shown. Coolant leads and connectors are color-tagged; red

for coolant return, green for coolant supply. Shield gas and plasma gas connections are left and right-hand
threaded and will not interchange.

Torch Leads: Coolant Supply & Return
Plasma Gas
Shield Gas

Art #: A-008382

Figure 3-12: Set Switches 3

Advertising