C. Methods of Reducing Electromagnetic Emissions

1. Main Power Supply
Welding equipment should be connected to the

mains supply according to the manufacturer’s

recommendations. If interference occurs, it may

be necessary to take additional precautions such

as filtering of the mains supply. Consideration

should be given to shielding the supply cable

of permanently installed welding equipment

in metallic conduit or equivalent. Shielding

should be electrically continuous throughout its

length. The shielding should be connected to the

Welding Power Source so that good electrical

contact is maintained between the conduit and

the Welding Power Source enclosure.

2. Maintenance of Welding Equipment
The welding equipment should be routinely

maintained according to the manufacturer’s

recommendations. All access and service doors

and covers should be closed and properly

fastened when the welding equipment is in

operation. The welding equipment should not

be modified in any way except for those changes

and adjustments covered in the manufacturer’s

instructions. In particular, the spark gaps of

arc striking and stabilising devices should

be adjusted and maintained according to the

manufacturer’s recommendations.

3. Welding Cables
The welding cables should be kept as short

as possible and should be positioned close

together, running at or close to the floor level.

4. Equipotential Bonding
Bonding of all metallic components in the

welding installation and adjacent to it should

be considered. However. Metallic components

bonded to the work piece will increase the

risk that the operator could receive a shock

by touching the metallic components and the

electrode at the same time. The operator should

be insulated from all such bonded metallic

components.

5. Grounding of the Workpiece
Where the workpiece is not bonded to earth

for electrical safety, nor connected to earth

grounding because of it’s size and position, e.g.

ship’s hull or building steelwork, a connection

bonding the workpiece to earth may reduce

emissions in some, but not all instances. Care

should be taken to prevent the earthing of the

workpiece increasing the risk of injury to users,

or damage to other electrical equipment. Where

necessary, the connection of the workpiece to

earth should be made by direct connection to the

workpiece, but in some countries where direct

connection is not permitted, the bonding should

be achieved by suitable capacitance, selected

according to national regulations.

6. Screening and Shielding
Selective screening and shielding of other cables

and equipment in the surrounding area may

alleviate problems of interference. Screening the

entire welding installation may be considered for

special applications.