Arcmaster 401mst power source – Tweco ArcMaster 401MST User Manual

Page 53

Advertising
background image

ARCMASTER 401MST POWER SOURCE

Manual 0-5287

3-23

INSTALLATION, OPERATION AND SETUP

3.15 Shielding Gas Flowmeter/ Regulator Operating Instructions

!

WARNING

This equipment is designed for use with welding grade (Inert) shielding gases only.

Shielding Gas Flowmeter/ Regulator Safety
Designed to reduce and control high pressure gas from a cylinder or pipeline to the working pressure required

for the equipment using it.
If the equipment is improperly used, hazardous conditions are created that may cause accidents. It is the users

responsibility to prevent such conditions. Before handing or using the equipment, understand and comply at all

times with the safe practices prescribed in this instruction.

SPECIFIC PROCEDURES for the use of flowmeter/ regulators are listed below.

1. NEVER subject the flowmeter/ regulator to inlet pressure greater than its rated inlet pressure.
2. NEVER pressurize a flowmeter/ regulator that has loose or damaged parts or is in a questionable condition.

NEVER loosen a connection or attempt to remove any part of a flowmeter/ regulator until the gas pressure

has been relieved. Under pressure, gas can dangerously propel a loose part.

3. DO NOT remove the flowmeter/ regulator from a cylinder without first closing the cylinder valve and

releasing gas in the flowmeter/ regulator high and low pressure chambers.

4. DO NOT use the flowmeter/ regulator as a control valve. When downstream equipment is not in use for

extended periods of time, shut off the gas at the cylinder valve and release the gas from the equipment.

5. OPEN the cylinder valve SLOWLY. Close after use.

User Responsibilities

This equipment will perform safely and reliable only when installed, operated and maintained, and repaired in

accordance with the instructions provided. Equipment must be checked periodically and repaired, replaced, or

reset as necessary for continued safe and reliable performance. Defective equipment should not be used. Parts

that are broken, missing, obviously worn, distorted, or contaminated should be replaced immediately.
The user of this equipment will generally have the sole responsibility for any malfunction, which results from

improper use, faulty maintenance, or by repair by anyone other than an accredited repairer.

CAUTION

Match flowmeter/ regulator to cylinder. NEVER CONNECT a flowmeter/ regulator designed for a particular

gas or gases to a cylinder containing any other gas.

FLOW GAUGE (DELIVERY)

HIGH PRESSURE

GAUGE (SUPPLY)

INLET

CONNECTION

OUTLET

CONNECTION

PRESSURE

ADJUSTING

SCREW

Art # A-12126

Figure 3-12 Adjusting Flow Rate

Advertising