Leveling the drill, 20 series opener single gauge wheel – Great Plains 2025P Operator Manual User Manual

Page 19

Advertising
background image

8/14/2006

118-928M

17

Preparation and Setup

Leveling the Drill

20 Series Opener Single Gauge Wheel
Refer to Figure 4

Initially adjust drill so bottom of opener tube runs
24 inches above ground when drill is lowered in
the field.

Refer to Figure 5

To adjust:

1.

Make sure block mount of the spring linkage
(2) is in the lower mount hole for planting in
bedded irrigation. The upper hole is for non-
bedded ground.

2.

Set spring linkage length. Turn spring linkage
to shorten or lengthen as necessary. Initially
set length to 6 1/8 inches between pin centers
to achieve the 24-inch dimension mentioned
above. When adjusting the linkage length, re-
member:

Lengthening linkage raises drill.

Shortening linkage lowers drill.

3.

Level drill with top three-point link.

Refer to Figure 6

NOTE: When drill is level, parallel links will be
running slightly uphill towards the front.

The 1-inch dimension shown is a general dimen-
sion that will vary with planting conditions.

IMPORTANT: Make sure the opener mount is
running higher than the opener body. This will
ensure an ample reserve for opener upfloat in
case the opener strikes a rock or other object.

Figure 4

Initial Operating Height

18280

Figure 5

Spring Linkage

21685

Figure 6

Leveling the Drill

18288

Advertising
This manual is related to the following products: