Great Plains 2025P Operator Manual User Manual

Page 21

Advertising
background image

8/14/2006

118-928M

19

Preparation and Setup

HD 10 Series Openers and 25 Series Openers
Single Gauge Wheel
Refer to Figure 10

Initially adjust drill so bottom of opener tube runs
26 inches above ground when drill is lowered in
the field.

Refer to Figure 11

To adjust:

1.

Make sure block mount of the spring linkage
(2) is in the lower mount hole for planting in
bedded irrigation. The upper hole is for non-
bedded ground.

2.

Set spring linkage length. Turn spring linkage
to shorten or lengthen as necessary. Initially
set length to 6 1/2 inches between pin centers
to achieve the 26-inch dimension mentioned
above. When adjusting the linkage length, re-
member:

Lengthening linkage raises drill.

Shortening linkage lowers drill.

3.

Level drill with top three-point link.

Refer to Figure 12

NOTE: When drill is level, parallel links will be
running level or slightly uphill towards the
front.

The 1-inch dimension shown is a general dimen-
sion that will vary with planting conditions.

IMPORTANT: Make sure the opener mount is
running higher than the opener body. This will
ensure an ample reserve for opener upfloat in
case the opener strikes a rock or other object.

Figure 10

Initial Operating Height

24000

Figure 11

Spring Linkage

22847

Figure 12

Leveling the Drill

24001

Advertising
This manual is related to the following products: