Great Plains 2025P Operator Manual User Manual

Page 48

Advertising
background image

2025P, 2020P Bedded, and
2010HDP

118-928M

8/14/2006

46

Refer to Figure 68

6.

While the meter is removed take time to in-
spect the meter drive chain and sprocket.

Refer to Figure 69

7.

Install the new meter along with the lower sec-
tion of the sliding seed tube.

Refer to Figure 70

8.

Engage the upper latch. Make sure the ta-
pered line-up pins near drive sprocket engage
completely in line-up holes.

22868

22869

22870

Figure 69

Figure 70

Figure 68

Advertising
This manual is related to the following products: