Install controls on upper frame tube – Great Plains PTO Kits Single-Section User Manual

Page 55

Advertising
background image

Great Plains Manufacturing, Inc.

Table of Contents

Index

Appendix A - Installation

51

2014-06-16

Table of Contents

Index

401-885M

Install Controls on Upper Frame Tube

These instructions apply to kit 411-016A. For other kits,
find the topic starting page in the table on page 48.

Refer to Figure 59
92. Select one each new:

411-018L LB FLOW CONTROL ASSY

806-165C U-BOLT 3/8-16 X 5 1/32 X 4 1/4

and two sets new:

804-013C WASHER LOCK SPRING 3/8 PLT

803-014C NUT HEX 3/8-16 PLT

If the fasteners are pre-installed in the valve
assembly, completely remove them.

93. Place the U-bolt

, from below at the upper frame

tube, approximately centered between the hitch top
link plates and the left hand 2-point plates.

94. The valve assembly

has port letters stamped

on the valve body. Orient the assembly so that ports
T & P are toward the front, and M & T toward the
back. Secure the valve assembly to the U-bolts with
the lock washers

and nuts

.

Continue at “Install Hoses” on page 54.

858

-00

4C

U

D

F

B

L

R

142

179

172

168

Figure 59:

Flow Controls on Upper Frame Tube

36304

142

179

172

168

179

142

172

168

Advertising
This manual is related to the following products: