Install controls on forward tool bar – Great Plains PTO Kits Single-Section User Manual

Page 56

Advertising
background image

52

Single-Section PTO Pumps

Table of Contents

Index

Great Plains Manufacturing, Inc.

401-885M

Table of Contents

Index

2014-06-16

Install Controls on Forward Tool Bar

These instructions apply to kits 411-035A and 411-036A.
For other kits, find the topic starting page in the table on
page 48.

Refer to Figure 60 (in which the orientation rose presumes
that the mainframe is in the unfolded position; if folded, the
front of the mainframe is actually to implement right)
95. Select one each new:

411-031K YP825R FLOW CONTROL ASSY

806-150C U-BOLT 3/8-16 X 7 1/32 X 6 GR5

and two sets new:

804-013C WASHER LOCK SPRING 3/8 PLT

803-014C NUT HEX 3/8-16 PLT

If the fasteners are pre-installed in the valve
assembly, completely remove them.

96. Place the U-bolt

, from the rear at approximately

the center of the forward tool bar on the mainframe.

97. The valve assembly

has port letters stamped

on the valve body. Orient the assembly so that ports
T & P are toward the front, and M & T toward the
back. Secure the valve assembly to the U-bolts with
the lock washers

and nuts

.

U

D

F

B

L

R

177

146

172

168

Figure 60:

Flow Controls on Forward Tool Bar

36306

146

177

172

168

177

146

172

168

Advertising
This manual is related to the following products: