15. Choose a tractor cab location where the module

does not obstruct vision, and the switches can be
safely operated during planting passes.

16. Route the power leads

to a source of +12 Vdc

power capable of supplying 12.6A.
Color code is red+, black-.
Direct battery connection is acceptable; the
controller module has its own master switch and
fuse.

17. Use a tie to secure the power lead.

18. Route the controller harness

to the tractor hitch.

Use ties to secure the hitch lead.

Drill Setup Checks

Hydraulic Bleed
Bleeding the hydraulic system is not a routine daily setup
item. If the system has not been charged since delivery,
or any hydraulic work has been done (such as installing
markers), “Bleeding Hydraulics” on page 145.

Drill Level
Drill sections are aligned and leveled at the factory, and
re-checked during dealer pre-delivery. Level normally
does not require routine adjustment before use. Great
Plains does recommend checking it once prior to first
field use. See “Level Frame Side to Side” on page 142.

Drill Option Setup

Even if factory- or dealer-installed, some optional items
may need checking or adjustment prior to first field use.
Install any that were not pre-installed.

Scrapers (Option)
If scrapers were ordered, and not dealer-installed, install
them now per the instructions in one of the following
manuals, which are available on the Great Plains website
if not ordered or included:

Figure 16: 833-294C

Point Row Switch Module

28240

P

H

P

H

Figure 17: 122-259K

10 & 20 Series Inside Scraper

20162

Advertising
This manual is related to the following products: