0 unpacking and setting up – Bio-Rad Econo Gradient Pump Kits User Manual
Page 6
Advertising
2.0 UNPACKING AND SETTING UP
2.1 UNPACKING INSTRUCTIONS
Carefully remove the unit from the shipping box, lifting from the
handle on the back of the pump or from the bottom of the instrument.
Remove the plastic bag and inspect the instrument for any external
damage. Figure 2-1 shows the contents of the box.
Figure 2-1. Parts supplied with the Econo Gradient Pump.
Unpacking
2
Model EGP
Econo Pump
Low-Pressure
Fittings Kit
Power Cord
System
Tubing
Pumphead
Tubing
4006161B.qxd 8/14/2003 8:09 AM Page 2
Advertising