Z6 z7 z8 z9 – Edge Lighting TruLine .5A, 24VDC - Plaster-In LED System User Manual

Page 10

Advertising
background image

10

11: Install mounting straps behind the drywall (suggested
spacing is every 32") by threading a drywall screw into
the perforated material.

12: Place the mounting strap behind the cut drywall and
rotate into place using the drywall screw as a handle.

13: Secure the mounting strap to the drywall using two
drywall screws. Mark the location on the drywall.

12

13

13

MOUNTING
STRAP

JUNCTION
BOX

DRYWALL
SCREW

14: Place the power connector into the end cap insert.

15: Slide the assembled end cap insert and power connector
into the end cap.

14

16: Secure the assembled power connector end cap to the
junction box with the #4-40 screw.

JUNCTION
BOX

8: Connect the red power supply (24VDC+) wire to the red
power connector wires with a wire nut.

9: Connect the black power supply (24VDC-) wire to the
black power connector wires with a wire nut.

10: Place the wire nut connections inside junction box.

8

9

Z6

Z7

Z8

Z9

POWER
CONNECTOR

END CAP
INSERT

END CAP

15

#4-40
SCREW

JUNCTION
BOX

16

Advertising