Edge Lighting TruLine .5A, 24VDC - Plaster-In LED System User Manual

Page 14

Advertising
background image

14

CHANNEL

TRAP DOOR
FRAME

LENS

7: Snap the lens into the assembled trap door frame and
channel BEFORE cutting to length. This ensures a proper
fit after installation.

45°

TRAP DOOR
FRAME

CHANNEL
SECTION

LENS

DESIRED LIT LENGTH

8: Determine the channel length and cut channel and lens at a 45° angle from the outer corner.

9: Cut additional lens/channel assembly for the opposing 45° angle and any other corners as required for the installation.

10: Measure and mark installation length, allowing for 0.75"
extra space at junction box for power end cap and 1.0" inch
at the end of the installation for the take-up box. Cut
out marked areas using appropriate tools.

11: Mark the location of the studs to the drywall for future
reference.

NOTE: To install channel vertically or in a wall without standard-
spaced studs, install perforated mounting straps every 32"
behind drywall and secure using two drywall screws. Mark the
location of any mounting straps to the drywall.

MARKING

STUD

1.05"

11

10

Z24

1.05"

12: Connect the red power supply (24VDC+) wire to the red
power connector wires with a wire nut.

13: Connect the black power supply (24VDC-) wire to the black
power connector wires with a wire nut.

14: Place the wire nut connections inside junction box.

JUNCTION BOX

13

Z22

Z23

Z25

7

8

10

12

Advertising