Xy z – Edge Lighting TruLine .5A, 24VDC - Plaster-In LED System User Manual

Page 8

Advertising
background image

8

DRYWALL

1.05"

5: Determine the desired length of lit installation area and
mark on wall. The total installation length cut will need to
be 1 3/4" taller than the desired lit installation area to
account for the fixture end caps. (For example, a desired
48" lit area will require a drywall cut of 49 3/4" inches)

Mark this length on the wall using the junction box
mounting plate and a level as a guide.

6: Cut out the marked area using a "Dremel Multi-Max" or a
6" Fixed Jab Saw.

8: Install mounting straps behind the drywall (suggested
spacing is every 32") by threading a drywall screw into
the perforated material.

9: Place the mounting strap behind the cut drywall and rotate
into place using the drywall screw as a handle.

10: Secure the mounting strap to the drywall using two
drywall screws. Mark the location on the drywall.

DREMEL
MULTI-MAX

6" FIXED
JAB SAW

STUD

JUNCTION
BOX

ALTERNATE VERTICAL INSTALLATION OPTION:
11:
Install 2x4 support braces (suggested spacing is every
32") before installing and finishing drywall.

STUD

SUPPORT
BRACE

Complete cutting, mounting,
plastering,painting, and LED strip
installation by following Steps 8
through 31 on Pages 3 through 7.

Section Four: Room-Wrapping
Configuration

INSTALLATION NOTES
Room-wrapping installations use LED strip bent 90° for inside
or outside corner configurations. Channel sections will be
miter cut on-site.

INSIDE CORNER

OUTSIDE CORNER

ASSEMBLED
CUTAWAY VIEW

X

Y

Z

Z1

5

6

9

10

10

11

11

MOUNTING
STRAP

JUNCTION
BOX

DRYWALL
SCREW

1.0"

DESIRED LIT LENGTH

0.75"

Advertising