Mn o – Edge Lighting TruLine .5A, 24VDC - Plaster-In LED System User Manual
Page 5
Advertising
21: Drill and countersink the channel at stud markings.
22: Properly secure the channel to the wall using drywall screws.
Ensure all screw heads are flush with the channel surface.
23: Apply ultra-thin drywall tape along edges of channel to prevent cracking of plaster after installation. DO NOT overlap strips of
drywall tape.
24: Use a 12" compound knife for a smooth compound spread. Sand, paint, and finish the plaster and drywall before removing the
blue contractor's tape.
NOTE:
Test the LED strip before any plaster work is done
NOTE: Cover the channel opening with contractor’s tape before plastering.
5
M
N
O
DRILL AND
COUNTERSINK
CHANNEL
ULTRA-THIN
DRYWALL TAPE
PLASTER
CONTRACTOR'S
TAPE
12" COMPOUND
KNIFE
21
23
24
Advertising