21: Drill and countersink the channel at stud markings.

22: Properly secure the channel to the wall using drywall screws.
Ensure all screw heads are flush with the channel surface.

23: Apply ultra-thin drywall tape along edges of channel to prevent cracking of plaster after installation. DO NOT overlap strips of
drywall tape.

24: Use a 12" compound knife for a smooth compound spread. Sand, paint, and finish the plaster and drywall before removing the
blue contractor's tape.

NOTE:

Test the LED strip before any plaster work is done

NOTE: Cover the channel opening with contractor’s tape before plastering.

5

M

N

O

DRILL AND
COUNTERSINK

CHANNEL

ULTRA-THIN
DRYWALL TAPE

PLASTER

CONTRACTOR'S
TAPE

12" COMPOUND
KNIFE

21

23

24