Edge Lighting TruLine .5A, 24VDC - Plaster-In LED System User Manual

Page 7

Advertising
background image

31: Snap the lens back onto the channel. Ensure lens is fully seated.

T

CORRECT

7

31

31

NOT INSTALLED

CORRECTLY

Section Three: Vertical Installation

JUNCTION
BOX

MOUNTING
BRACKET

ADJUSTABLE
MOUNTING BAR

PHILLIPS
SCREW

VERTICAL

ORIENTATION

1

1: Mount each adjustable mounting bar to one side of the
junction box and secure them with the mounting brackets
and two Phillips screws provided.

STUD

ADJUSTABLE
MOUNTING BAR

CONDUIT

JUNCTION
BOX

2: Remove a knockout to install the power line conduit (if
required by local electrical code.

3: Install the conduit and run the low voltage 24V DC power
wires coming from the remote power supply to the
junction box.

4: Refer to the instruction provided with the power supply
along with the wiring diagram for proper wiring.

INST

ALLA

TION

DIRECTION

U

V

3

4: Cut a section of drywall using a 6" fixed jab saw or other
appropriate tool to expose the mounting plate area.

W

3

DRYWALL

6" FIXED
JAB SAW

Advertising