GLAZING

R E L I A N C E - T C C U R T A I N W A L L I N S T A L L A T I O N M A N U A L

TM

WW-380 zone bridge

STEP 1

STEP 2

SSG Vertical

Run thermal isolator continuous

over bridge at SSG mullion (no

special sealing required)

FIGURE 28

Zone Bridge Installation

FIGURE 29

Isolator Installation

MAY 2013

30

Phone: 1-866-OLDCASTLE (653-2278)

Web Address: www.oldcastlebe.com

3.18 WW-380 bridge is required at SSG mullion to horizontal connections. Apply sealant along face

of mullion as shown in step 1, slide bridge over horizontal tongue and apply additional sealant along

horizontal and mullion. The WW-380 bridge has two sealant tracks along each side. Force sealant into

these tracks to seal ends of thermal struts.

SEE FIGURE 28.

3.19 Thermal isolator when using SSG mullions will run continuous. No additional sealant is required

at these intersections.

SEE FIGURE 29.

3.20 Install WW-327 mull caps at head and sill using (2) FS-320 drive screws. Reference FIGURE 3,

pg 10.

Seal along tongue of horizontal and across

face of mullion before installing zone bridge.

Force sealant into all races

on face of mullion.

Tool sealant along

top & sides of zone

bridge to form a

water tight seal.

ZONE BRIDGE AT SILL

(HEAD SIMILAR)

WW-327

Existing seal