Inspection and Start-up Checklists

检查和启动检查清单

Receiving and Inspecting 接收和检查

 Unit received undamaged 完整无损地器材单元接受

 Unit received complete as ordered including accessories 收到完整的器材包括附件

Handling and Installing 搬运和安装

 Unit mounted on solid level surface 装置安装在坚实平坦的表面

 Sufficient space allowed for access to unit and accessories

Proper electrical service

provided 设备周围有足够的空间,电力供应正确
 Hot water provided to humidifier 加湿机热水供应

 Drain lines and trap installed properly 排水管线和安装正确的陷阱

 Ductwork, fittings and grilles installed properly 管道,配件及格栅正确安装

 All cold duct surfaces insulated 所有冷风管道表面绝缘

 Low ambient control included if freezing condition present

No obstructions to air flow to condenser

低温环境控制考虑到冰冻状态,冷凝器空气 流动没有障碍物干扰。

Starting-up the Unit 启动主机

 General visual inspection looks good All wiring connections checked 一般目视检查过关 所
有线路连接检查过关
 All ducts, grilles and panels in place 通风管道,格栅和盖板全部到位道。

 Start unit 启动主机

 Check ducts and connections for air leaks 检查管道和连接处空气泄漏

 Balance air distribution 平衡空气分布

 Confirm condenser airflow is unrestricted 确认冷凝器气流不受限制

 Verify cooling and heating operation 检查冷却和加热操作

 Check for excessive noise or vibration 检查噪音或震动过大