Step 4: begin a survey, continued – Leica Geosystems GPS System 500 - Getting Started with Static and Kinematic Surveys User Manual
Page 18

18
Static and Kinematic Surveys-2.0.0en
Taking Static / Rapid-Static measurements
6
7
8
9
3
As an example we can create a new
job called "Test":
After pressing F1 CONT the list of
available jobs is updated and now
also shows the job "Test":
You can now enter a name for a new
job; press ENTER upon completing
the input of the name. Input fields for
description and creator are optional
and can be left blank.
By default the new job will be
assigned to the PC-card. If needed
this can be changed to internal by
toggling this input field to "Internal".
Pressing F1 CONT which confirms
the creation of a new job name and
its location. Press ESC if you want to
leave this field without creating a new
job. Pressing F6 QUIT has the same
effect.
Now press F1 CONT to confirm the
selection of the newly created job.
Finally you have to select the
antenna type and antenna setup
which you are using. Normally this
will be AT502 on tripod (or AT501 on
tripod in case of a SR510 sensor).
See Technical Reference Manual
"Measuring Antenna Heights" for
further details.
Step 4: Begin a survey, continued
Now press F2 NEW. The following
panel appears: