STIEBEL ELTRON SOL 25 PLUS User Manual

Page 37

Advertising
background image

WWW.STIEBEL-ELTRON-USA.COM

SOL 25 PLUS |

37

EN

g

L

IS

h

Step 14: Align the holes and insert one of
the 3/8”–16 x 3” bolts and install a 3/8”
serrated flange nut. Repeat these steps for
the remaining riser and base supports.

Step 16: Close up view of assembly.

Step 17: Attach the riser support of one of
the right angle assemblies which were just
assembled to the top of the rectanglular
assembly using of the 3/8”–16 x 3” bolts
and a 3/8” serrated flange nut. Note that
the top is the part in which the diagonal
support does not protrude past the edge of
the profile rail.

Advertising