STIEBEL ELTRON SOL 25 PLUS User Manual

Page 42

Advertising
background image

42

| SOL 25 PLUS

WWW.STIEBEL-ELTRON-USA.COM

Step 05: Insert the threads of the M10 bolt
through the hole in the support rail.

Step 06: Install M10 nut. Repeat the
preceding 4 steps for the top right corner of
the rectangle.

Step 07: Align the profile rail in the same
manner as the top (The longer cutout
surface should be facing toward the center
of the rectangle and be parallel to the
ground).

Advertising