STIEBEL ELTRON SOL 25 PLUS User Manual
Page 52
Advertising
52
| SOL 25 PLUS
WWW.STIEBEL-ELTRON-USA.COM
Step 15: Align the two riser assemblies
with the top side of the assembled support
rectangle as shown. Note that the slotted
sides of the risers are adjacent to the sides
of the rectangle, the sides with the circular
holes are flat on the ground, and the bottom
of the ‘L’ of the risers are both facing away
from the rectangle.
Step 16: Install an M10 x 30 bolt through the
holes one of the ‘L’ brackets and one of the
riser assemblies.
Step 17: Install an M10 serrated flange nut.
Repeat this procedure for the other side.
Advertising