1 program sequence after switching on, Using the device – FRITSCH PULVERISETTE 7 premium line User Manual

Page 49

Advertising
background image

If prolonged blow-off noises and the discharge of source material sus-

pension indicate a high internal pressure after cooling, take special care

when you continue to grind. The pressure must always be released after

the cooling pauses (at least for 30 minutes in order that the suspension

can settle) to prevent it from getting too high. Sooner or later, the

increase in pressure will stop.

5.12.1

Program sequence after switching on

1.

Turn the device on at the main switch.

2.

The display lights up.

3.

During the start and initialisation phase, you can press the INFO

button to have information displayed with the contact address.

Press the Next button to close this information again.

4.

Grinding station 1 is moved into the loading position. The grinding

chamber cover opens automatically.

5.

Insert the grinding bowl (Ä Chapter 5.5 ‘Filling the grinding bowl’

on page 36), loaded with the sample (Ä Chapter 5.9 ‘Handling the

grinding bowl’ on page 40) and closed correctly, in the grinding

bowl holder (Ä Chapter 5.9.4 ‘Inserting the grinding bowl in the

grinding bowl holder’ on page 44).

Using the device

- 49 -

Advertising