AERCO BMK 6000 User Manual

Page 198

Advertising
background image

Benchmark 6000 Boiler Installation, Operation & Maintenance Manual

APPENDIX J – RECOMMENDED PERIODIC TESTING

Page 198 of 210

AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913

OMM-0086_0D

03/20/14

Ph.: 800-526-0288

GF-133

High water
temperature safety
control test

Annually

Service

Technician

See section 6.5

Operating controls

Annually

Operator

See section 3.2

Low air flow

Monthly

Operator

See section 6.8

Low and high gas
pressure interlocks

Monthly

Operator

See sections 6.2 and 6.3

Air/Fuel Valve purge
position switch

Annually

Service

Technician

See section 6.10

Air/Fuel Valve ignition
position switch

Annually

Service

Technician

See section 6.11

Safety valves

As required

Operator

Check per A.S.M.E. Boiler and
Pressure Vessel Code, Section IV

Inspect Burner
components

Semi-

Annually

Service

Technician

See section 7.7

Condensate Trap

Semi-

Annually

Operator

See section 7.8

Oxygen (O

2

) Level

Monthly

Operator

Verify oxygen level is between 3% and
8% during boiler operation

Pilot Sensor

Semi-

Annually

Operator

Red LED should be on when operating

Pilot View Port

Monthly

Operator

Turn off boiler first.






Advertising