Benchmark 6000 boiler, Installation, operation & maintenance manual – AERCO BMK 6000 User Manual

Page 5

Advertising
background image

Benchmark 6000 Boiler

Installation, Operation & Maintenance Manual

OMM-0086_0D

AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913

Page 5 of 210

GF-133

Ph.: 800-526-0288

03/20/14

6.9 SSOV PROOF OF CLOSURE SWITCH ..................................................................................................................... 87

6.10 PURGE SWITCH OPEN DURING PURGE .............................................................................................................. 88

6.11 IGNITION SWITCH OPEN DURING IGNITION ...................................................................................................... 89

6.12 SAFETY PRESSURE RELIEF VALVE TEST............................................................................................................... 90

CHAPTER 7.

MAINTENANCE ............................................................................................................... 91

7.1 MAINTENANCE SCHEDULE .................................................................................................................................. 91

7.2 PILOT BURNER ..................................................................................................................................................... 92

7.3 MAIN FLAME DETECTOR ...................................................................................................................................... 93

7.4 O

2

SENSOR ........................................................................................................................................................... 94

7.5 COMBUSTION CALIBRATION & PILOT REGULATOR ADJUSTMENT ...................................................................... 95

7.5.1 Pilot Regulator Pressure Testing................................................................................................................... 95

7.5.2 Pilot Regulator Pressure Calibration ............................................................................................................. 97

7.6 SAFETY DEVICE TESTING ...................................................................................................................................... 98

7.7 BURNER ASSEMBLY INSPECTION ......................................................................................................................... 99

7.8 REFRACTORY REMOVAL & REPLACEMENT ........................................................................................................ 102

7.8.1 Rear Refractory Removal & Replacement .................................................................................................. 102

7.8.2 Front Refractory Removal & Replacement ................................................................................................. 106

7.9 CONDENSATE DRAIN TRAP ................................................................................................................................ 108

7.10 AIR FILTER CLEANING & REPLACEMENT .......................................................................................................... 109

7.11 SHUTTING THE BOILER DOWN FOR AN EXTENDED PERIOD OF TIME ............................................................. 110

7.12 PLACING THE BOILER BACK IN SERVICE AFTER A PROLONGED SHUTDOWN .................................................. 110

CHAPTER 8.

TROUBLESHOOTING GUIDE ...................................................................................... 111

8.1 INTRODUCTION ................................................................................................................................................. 111

8.2 ADDITIONAL FAULTS WITHOUT SPECIFIC FAULT MESSAGES ............................................................................ 124

CHAPTER 9.

RS-232 COMMUNICATION ........................................................................................... 129

9.1 INTRODUCTION ................................................................................................................................................. 129

9.1.1 Aquiring the PuTTY Application .................................................................................................................. 129

9.1.2 Logging on to a Remote Machine Using PuTTY .......................................................................................... 129

9.1.3 Running a Command on a Remote Machine Using PuTTY ......................................................................... 130

9.2 RS-232 COMMUNICATION SETUP ..................................................................................................................... 131

9.3 MENU PROCESSING UTILIZING RS-232 COMMUNICATION ............................................................................... 131

9.4 DATA LOGGING .................................................................................................................................................. 132

9.4.1 Fault Log ..................................................................................................................................................... 133

9.4.2 Operation Time Log .................................................................................................................................... 133

9.4.3 Sensor Log .................................................................................................................................................. 134

CHAPTER 10.

BOILER SEQUENCING TECHNOLOGY ...................................................................... 135

10.1 INTRODUCTION ............................................................................................................................................... 135

10.2 AERCO BST Quick Start Chart .......................................................................................................................... 136

10.3 BST Implementation Instruction ...................................................................................................................... 137

10.3.1 Option 1 - Constant Setpoint with DIRECT Wired Header Sensor ............................................................ 137

10.3.2 Option 2 - Constant Setpoint with MODBUS Wired Header Sensor......................................................... 138

10.3.3 Option 3 - Outdoor Reset with DIRECT WIRED Header Sensor AND DIRECT WIRED Outdoor Sensor ..... 139

10.3.4 Option 4 - Outdoor Reset with MODBUS Header Sensor AND MODBUS Outdoor Sensor ...................... 141

10.3.5 Option 5 - Remote Setpoint with DIRECT WIRED Header Sensor AND 4-20ma Setpoint Drive ............... 143

10.3.6 Option 6 - Remote Setpoint with DIRECT WIRED Header Sensor AND MODBUS Setpoint Drive............. 144

10.3.7 Option 7 - Remote Setpoint with MODBUS Header Sensor AND 4-20ma Setpoint Drive ........................ 145

10.3.8 Option 8 - Remote Setpoint with MODBUS Header Sensor AND MODBUS Setpoint Drive ..................... 147

APPENDIX A – BOILER MENU ITEM DESCRIPTIONS ................................................................................................. 149

APPENDIX B – STARTUP, STATUS & DISPLAY MESSAGES ........................................................................................ 157

APPENDIX C – SENSOR RESISTANCE/VOLTAGE CHART ............................................................................................ 161

APPENDIX D – INDOOR/OUTDOOR RESET RATIO CHARTS ...................................................................................... 163

APPENDIX E – BOILER DEFAULT SETTINGS .............................................................................................................. 167

APPENDIX F – CLEARANCE DRAWINGS .................................................................................................................... 169

Advertising