Change log – AERCO BMK 1000 User Manual

Page 192

Advertising
background image

Benchmark 750/1000 Boiler Installation, Operation & Maintenance Manual

Page 192 of 192

AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913

OMM-0082_0J

05/21/2014

Ph.: 800-526-0288

GF-130

© AERCO International,

Inc., 2014

Change Log:

Date

Description

Changed By

03/19/2014

Rev I:
PIR 780: replaced mechanical latch with magnetic
PIR 981: Expanded Table A in Appendix F Part List
PIR 934-33: Modified step 13 in Combustion
Calibration regarding defective O

2

Sensor.

PIR 934-37: Modified Blocked Inlet Switch Test
instructions, section 6.8.2.
PIR 960: Addition of two sub-sections in 2.10.12;
addition of section 2.15 Sequencing Isolation Valve
Installation; 3.9 _BST Menu; addition of Chapter 10
– Boiler Sequencing Technology; replaced all wiring
schematics in Appendix I, addition of 24V
Sequencing Valve & Flame Rod Amplifier.
PIR 974: Replaced Gas train harness 161450 with
63147 in Appendix G.
PIR 1000: P/N 61026 now labeled “Lean Oxygen
Sensor,” 64081 now named “ECU”
PIR 1005:
Changed 12 Month Maintenance Kit part
number to 58025-01

Chris Blair

05/21/2014

Rev J:
PIR 749: Added Propane to section 2.8 Gas supply
Piping; new Propane combustion calibration section
4.4; modified sections 6.2 & 6.3; added Propane
gas train 22140-3 drawings to Appendix G.
PIR 934-65
: Added explanatory paragraph & note to
section 2.15 – Sequencing Isolation Valve
Installation

Chris Blair


Advertising
This manual is related to the following products: