Benchmark 750/1000 Boiler Installation, Operation & Maintenance Manual

CHAPTER 6 – SAFETY DEVICE TESTING

Page 86 of 192

AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913

OMM-0082_0J

05/21/2014

Ph.: 800-526-0288

GF-130

Figure 6-4: Boiler Rear View Showing Air Inlet Location

6.9 SSOV PROOF OF CLOSURE SWITCH

The SSOV shown in Figure 6-1 contains the proof of closure switch. The proof of closure switch
circuit is checked as follows:

SSOV Proof of Closure Switch

1. Set the unit’s ON/OFF switch to the OFF position.

2. Place the unit in Manual Mode and set the valve position between 25% and 30%

3. Refer to Figure 6-3 and locate the SSOV.

4. Remove the cover from the SSOV by loosening the screw shown in Figure 6-5. Lift off the

cover to access the terminal wiring connections.

5. Disconnect wire #148 from the SSOV to “open” the proof of closure switch circuit.

6. The unit should fault and display SSOV SWITCH OPEN.

7. Replace wire #148 and press the CLEAR button.

8. Set the ON/OFF switch to the ON position to start the unit.

9. Remove the wire again when the unit reaches the purge cycle and PURGING is

displayed.

10. The unit should shut down and display SSOV FAULT DURING PURGE.

11. Replace the wire on the SSOV and press the CLEAR button. The unit should restart

.

Figure 6-5: SSOV Actuator Cover Location

SSOV ACTUATOR

COVER

ACTUATOR
COVER SCREW

SECONDARY WATER

INLET/RETURN

PRIMARY WATER

INLET/RETURN

EXHAUST MANIFOLD

AIR INLET
(Combustion Air
Duct removed)