AERCO BMK 1000 User Manual

Page 5

Advertising
background image

Benchmark 750/1000 Boiler Installation, Operation & Maintenance Manual

OMM-0082_0J

AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913

Page 5 of 192

GF-130

Ph.: 800-526-0288

05/21/2014

5.6.1 ACS External Field Wiring ........................................................................................................... 74

5.6.2 ACS Setup and Startup ................................................................................................................ 74

5.7 COMBINATION CONTROL SYSTEM (CCS) ........................................................................................... 74

5.7.1 Combination Control System Field Wiring.................................................................................. 75

5.7.2 Combination Control System Setup and Startup ........................................................................ 75

CHAPTER 6.

SAFETY DEVICE TESTING .................................................................. 77

6.1 TESTING OF SAFETY DEVICES ............................................................................................................. 77

6.2 LOW GAS PRESSURE FAULT TEST ...................................................................................................... 78

6.3 HIGH GAS PRESSURE TEST ................................................................................................................. 79

6.4 LOW WATER LEVEL FAULT TEST ........................................................................................................ 80

6.5 WATER TEMPERATURE FAULT TEST .................................................................................................. 81

6.6 INTERLOCK TESTS .............................................................................................................................. 82

6.6.1 Remote Interlock Test ................................................................................................................ 82

6.6.2 Delayed Interlock Test ................................................................................................................ 82

6.7 FLAME FAULT TESTs .......................................................................................................................... 83

6.8 AIR FLOW FAULT TESTS ..................................................................................................................... 84

6.8.1 Blower Proof Switch Test ............................................................................................................ 84

6.8.2 Blocked Inlet Switch Test ............................................................................................................ 84

6.9 SSOV PROOF OF CLOSURE SWITCH ................................................................................................... 86

6.10 PURGE SWITCH OPEN DURING PURGE ........................................................................................... 87

6.11 IGNITION SWITCH OPEN DURING IGNITION ................................................................................... 87

6.12 SAFETY PRESSURE RELIEF VALVE TEST ............................................................................................ 88

CHAPTER 7.

MAINTENANCE .................................................................................... 89

7.1 MAINTENANCE SCHEDULE ................................................................................................................ 89

7.2 IGNITER-INJECTOR REPLACEMENT .................................................................................................... 90

7.3 FLAME DETECTOR REPLACEMENT ..................................................................................................... 92

7.4 O

2

SENSOR REPLACEMENT ................................................................................................................ 93

7.5 COMBUSTION CALIBRATION ............................................................................................................. 93

7.6 SAFETY DEVICE TESTING .................................................................................................................... 93

7.7 BURNER ASSEMBLY INSPECTION ....................................................................................................... 93

7.8 CONDENSATE DRAIN TRAP MAINTENANCE ...................................................................................... 96

7.9 AIR FILTER CLEANING & REPLACEMENT ............................................................................................ 98

7.10 SHUTTING THE BOILER DOWN FOR AN EXTENDED PERIOD OF TIME ............................................. 99

7.11 PLACING THE BOILER BACK IN SERVICE AFTER A PROLONGED SHUTDOWN .................................. 99

CHAPTER 8.

TROUBLESHOOTING GUIDE ............................................................ 101

8.1 INTRODUCTION ............................................................................................................................... 101

8.2 ADDITIONAL FAULTS WITHOUT SPECIFIC FAULT MESSAGES .......................................................... 113

CHAPTER 9.

RS-232 COMMUNICATION ................................................................ 117

9.1 INTRODUCTION ............................................................................................................................... 117

9.1.1 Aquiring the PuTTY Application ................................................................................................ 117

9.1.2 Logging on to a Remote Machine Using PuTTY ........................................................................ 117

9.1.3 Running a Command on a Remote Machine Using PuTTY ....................................................... 118

9.2 RS-232 COMMUNICATION SETUP ................................................................................................... 119

Advertising
This manual is related to the following products: