Benchmark 750/1000 Boiler Installation, Operation & Maintenance Manual

CHAPTER 2 – INSTALLATION

Page 36 of 192

AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913

OMM-0082_0J

05/21/2014

Ph.: 800-526-0288

GF-130

Installing Sequencing Isolation Valve – Continued

2.

The boiler’s shell harness has one unused cable. One end of this cable is connected to
the DELAYED INTERLOCK IN terminals in the I/O board (see Figure 2-14) while the other
end contains a Molex connector with a jumper wire inserted in it (this jumper wire allows
units that do not have a sequencing isolation valve to operate normally). Find the free end
of this cable inside the unit’s enclosure.

Figure 2-14: Sequencing Isolation Valve Installed

3.

Remove the jumper wire from the Molex connector and then plug it into the sequencing
isolation valve’s connector.