Scm boot and verification of the modules – Cisco 11500 Series User Manual

Page 139

Advertising
background image

C-9

Cisco 11500 Series Content Services Switch Hardware Installation Guide

78-13884-03

Appendix C Troubleshooting

Troubleshooting the Boot Process

SCM Boot and Verification of the Modules

After the CSS 11503 or CSS 11506 completes the OffDM boot process, it displays
the main banner and starts the Online Diagnostic Monitor (OnDM). During
OnDM, the SCM downloads software to each of the modules and boots the
modules. Then, the SCM verifies that each module is functioning.

If there is a failure on a module, the SCM attempts to boot the module three times.
If the SCM is unsuccessful, the CSS generates the following log message and
saves it in the boot.log file:

CHMGR: Slot slot/subslot had diagnostic failures - NOT STARTING UP

Then the SCM shuts down the slot and no longer recognizes it. If you use the show
chassis
command, the slot does not appear. If a module failure occurs:

1.

Power down the CSS.

2.

Reseat the module.

3.

Power on the CSS.

If reseating the module does not correct its failure, replace the module.

For additional information on troubleshooting the modules during normal CSS
operation, see

“Troubleshooting the CSS 11501”

. For information on log files, see

“Log File Information”

.

Advertising