INSTALLATION

Jobsite Survey

Complete the following checks before installation.

1. Consult local building codes and the NEC (National

Electrical Code) ANSI/NFPA 70 for special installa-

tion requirements.

2. Determine unit location (from project plans) or select

unit location.

3. Check for possible overhead obstructions which may

interfere with unit lifting or rigging.

Step 1 — Plan for Unit Location

Select a location for the unit and its support system (curb

or other) that provides for the minimum clearances

required for safety. This includes the clearance to

combustible surfaces, unit performance and service access

below, around and above unit as specified in unit

drawings. See Fig. 2.
NOTE: Consider also the effect of adjacent units.
Unit may be installed directly on wood flooring or on Class

A, B, or C roof--covering material when roof curb is used.

Do not install unit in an indoor location. Do not locate air

inlets near exhaust vents or other sources of contaminated

air.

18” (457)

42" (1067)

18" (457)

42" (1067)

1

Required bottom condensate drain connection.
Otherwise, 36” (914mm) for condensate connection.

1

C07459

Fig. 2 -- Service Clearance Dimensional Drawing

Although unit is weatherproof, avoid locations that permit

water from higher level runoff and overhangs to fall onto

the unit.

Select a unit mounting system that provides adequate

height to allow for removal and disposal of frost and ice

that will form durring the heating--defrost mode as well as

allow installation of condensate trap per requirements.

Refer to Step 9 — Install External Condensate Trap and

Line – for required trap dimensions.