YSI 600LS - User Manual User Manual

Page 59

Advertising
background image

Sondes

Section 2

YSI Incorporated

Environmental Monitoring Systems Operations Manual

2-53


The display now shows the next date and time for logging, and the stop date and time for the logging study.
Most importantly, note that the “B” command now shows B-Stop logging, a confirmation that the logging
has indeed been initiated.

The Unattended study will terminate when the duration you specified has expired or the batteries are
expended. If you want to terminate sooner, simply select 2-Unattended sample from the Run menu, then
B-Stop logging. Select 1-yes and return to the Unattended setup menu.



----------------Logging----------------
1-Interval=00:15:00
2-Next at 07/17/96
3-Next at 18:00:00
4-Stop at 07/31/96
5-Stop at 18:00:00
6-File=clrlake3
7-Site=Clear Lake at Spillway
8-Bat volts: 11.7
9-Bat life 25.5 days
A-Free mem 41.3 days
B-Stop logging
C-Show Live Data

Select option (0 for previous menu):


Stop logging?
1-Yes
2-No

Select option (0 for previous menu):

Advertising