START-UP CHECKLIST

(Remove and Store in Job File)

I. PRELIMINARY INFORMATION

MODEL NO_______________________

DATE____________________________

SERIAL NO.: .

TECHNICIAN:

II. PRE-START-UP (insert checkmark in box as each item is completed)

□ VERIFY THAT ALL PACKING MATERIALS HAVE BEEN REMOVED FROM UNIT

□ REMOVE ALL SHIPPING HOLDDOWN BOLTS AND BRACKETS PER INSTALLATION INSTRUCTIONS

□ VERIFY THAT CONDENSATE CONNECTION IS INSTALLED PER INSTALLATION INSTRUCTIONS

□ CHECK ALL ELECTRICAL CONNECTIONS AND TERMINALS FOR TIGHTNESS

□ CHECK GAS PIPING FOR LEAKS

□ CHECK THAT INDOOR-AIR FILTER IS CLEAN AND IN PLACE

□ VERIFY THAT UNIT INSTALLATION IS LEVEL

□ CHECK FAN WHEEL AND PROPELLER FOR LOCATION IN HOUSING/ORIFICE AND SETSCREW

TIGHTNESS

Ref

nect
Dete

If

pect
leak
refri
Leal

If

man
Refi

Gai

unie
lem

III. START-UP

ELECTRICAL

SUPPLY VOLTAGE

COMPRESSOR AMPS

COMPRESSOR AMPS

INDOOR-FAN AMPS

L1-L2

L2-L3

L3-L1

LI

1,2

L3

LI

L2

1.3

LI

1.2

L3

Q

LIJ

1=

o

Q

G

z

O

_J

<

H

3

o

TEMPERATURES

OUTDOOR-AIR TEMPERATURE

RETURN-AIR TEMPERATURE

COOLING SUPPLY AIR

GAS HEAT SUPPLY AIR

PRESSURES

GAS INLET PRESSURE

GAS MANIFOLD PRESSURE

REFRIGERANT SUCTION

REERIGERANT DISCHARGE

DB

DB

IN. WG

IN. WG

PSIG

PSIG

WB

□ VERIFY REFRIGERANT CHARGE USING CHARGING TABLES

□ VERIFY THAT 3-PHASE SCROLL COMPRESSOR ROTATING IN CORRECT DIRECTION

Copyright 1994 Carrier Corporation

Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obiigations.

Book|1 |4

PC 111

Cataiog No. 534-842 Printed in U S.A

Form 48SS,SX-2Si Pg CL-1

5-94 Repiaoes: 48SS,SX-1Si

Tab 1a 6a

Cop

Boo

Tab

Advertising