Control setup, Before starting, Installation – Bonaire Touchpad User Manual

Page 37: Ontrol setup, Etting, P the, Ontrol, Eneral, Controls – installation / setup / commissioning

Advertising
background image

M

ULTI

-A

PPLIANCE

T

OUCH

P

AD

Controls – Installation / Setup / Commissioning

Control setup

Setting Up the Control - General

B

EFORE

S

TARTING

Before attempting to use the setup instructions for the controls system, make sure the low voltage cable is
connected and the 240 volt power has been turned on to the heater / cooler.
The Low voltage controls are connected to the unit control box / controller via a 20-metre low voltage loom.

NOTE: Do not run the low voltage loom in long parallel runs with 240V mains cables. Keep the

low voltage loom 200mm away from any long runs of mains wiring.
Cross over mains wiring at right angles.
Do not use existing access holes in wall cavities where 240V mains wiring exists. Drill a
new access hole 200mm from the existing hole.

I

NSTALLATION

Where the control is using the thermostat for operation, it must be installed approximately 1.5 metres
above the floor level on a room wall which is most commonly used for best average sensing.
Secure the Touch Pad Control back panel to the wall using screws and plugs.















Do not locate Touch Pad near concealed hot or cold water pipes, warm air ducts, radiators, sunlight, or
draughts from hallways, stairways or fireplaces and seal against draughts through wall cavities. These can
all affect the temperature.





Bonaire Control Systems

Page 37

Advertising