General, Unit – ducted heating, Unit – dual cycle refrigerated air conditioning – Bonaire Touchpad User Manual

Page 53: Commissioning, Check, List, Controls – installation / setup / commissioning

Advertising
background image

M

ULTI

-A

PPLIANCE

T

OUCH

P

AD

Controls – Installation / Setup / Commissioning

COMMISSIONING CHECK LIST

G

ENERAL

†

All equipment ordered by the customer is installed.

†

The unit is level and secure.

†

The mains and control wiring are complete and the circuit breaker and GPO are turned ON.

†

All Controller functions for the appliance operate.

†

All electrical or gas connections are to manufacturers specifications and the relevant electrical or gas
standards and codes.


U

NIT

D

UCTED

H

EATING

†

Electrical polarity of the power outlet is correct.

†

Heater is installed away from sources of dust and fumes (i.e. pool chlorine/petrol etc).

†

Gas leaks checked for, none present.

†

Flue outlet pipe complies with limits given / code and is sealed waterproof.

†

Combustion air meets requirements (internal, under floor).

†

Fan speed set is correct.

†

Burner pressure is correct.

†

Mounting pad/platform complies with requirements / codes.



U

NIT

D

UAL

C

YCLE

R

EFRIGERATED

A

IR

C

ONDITIONING

†

Unit Foundation correct

†

All pipe work is welded and vacuumed down.

†

Condenser Coil is purged before charging.

†

System is charged, all joints checked and pressures set correctly

†

Condenser unit is level

†

All clearances around the condenser set to manufacturers specifications.






Bonaire Control Systems

Page 53

Advertising