Unit - ducted evaporative air conditioner, Ductwork, Site – Bonaire Touchpad User Manual

Page 54: Customer hand over

Advertising
background image

M

ULTI

-A

PPLIANCE

T

OUCH

P

AD

Controls – Installation / Setup / Commissioning

U

NIT

-

D

UCTED

E

VAPORATIVE

A

IR

C

ONDITIONER

†

The water supply line has been flushed to clear swarf and debris and is free of leaks.

†

The tank is free of foreign matter and debris and the water isolating tap is turned ON.

†

Water drainpipe work is completed and sealed.

†

The water basin fills with water and the float valve closes correctly when the water level is 65-70mm
below the overflow level.

†

The water pump operates correctly when turned ON at the controller.

†

The Dialflo water bleed rate is adjusted to suit local water conditions.

†

The Dump Valve. The tank drains correctly when unit turns off.

†

The fan deck is correctly located and the fan blade spins freely.

†

The fan operates through the entire speed range.

†

The minimum fan speed is correctly set.

†

Water distribution is even with the filter pads fitted and the air conditioner operating pump and fan.

D

UCTWORK

†

All ductwork is completed to plan, correctly supported and airtight, with no bend less than 1.5 x the
ductwork diameter.

†

Air distribution checked, dampers are adjusted and all outlets correctly adjusted and wiped clean.

†

All roof penetrations are fully sealed and watertight.

†

Manhole cover replaced.

S

ITE

†

All rubbish has been removed from inside and on the roof.

C

USTOMER

H

AND

O

VER

†

The operation of the Controller.

†

The need to open windows and doors for the correct operation of Fresh Air Conditioning

†

The operation of the bleed or dumping system and it’s importance to operate all the time in ducted
evaporative air conditioning

†

Maintenance requirements





Bonaire Control Systems

Page 54

Advertising