1 belt & drive system installation (serpentine) – Vortech Universal GM LSX Tuner Kits User Manual

Page 34

Advertising
background image

P/N: 4GE020-015 v1.0, 2010-05-24

©2010 Vortech Engineering, LLC

All Rights Reserved, Intl. Copr. Secured

24

SERPENTINE DRIVE SYSTEMS

ONLY (ALL OTHERS CONTINUE

TO 6.2)

A. Assemble the supplied smooth idler, M10-1.5

x 110mm screw, idler pilot spacer, and idler

pilot washer

with the head of the screw on

the snap ring side of the idler as shown in

Fig. 6P. Install the idler assembly into the

lower left-hand hole in the tensioner support

plate as shown in Figure 6.1A.

B. Remove temporarily installed M10-1.5 X

120mm screw and use to install the pre-

assembled spring tensioner into the upper

set of holes located on the front tensioner

plate. See Fig 5O.

Fig 6.1A

Fig 6.1B

FIXED

IDLER PULLEY

Fig 6.1C

6.1 BELT & DRIVE SYSTEM

INSTALLATION (SERPENTINE)

Advertising