1 belt & drive system installation (serpentine) – Vortech Universal GM LSX Tuner Kits User Manual
Page 34
Advertising

P/N: 4GE020-015 v1.0, 2010-05-24
©2010 Vortech Engineering, LLC
All Rights Reserved, Intl. Copr. Secured
24
SERPENTINE DRIVE SYSTEMS
ONLY (ALL OTHERS CONTINUE
TO 6.2)
A. Assemble the supplied smooth idler, M10-1.5
x 110mm screw, idler pilot spacer, and idler
pilot washer
with the head of the screw on
the snap ring side of the idler as shown in
Fig. 6P. Install the idler assembly into the
lower left-hand hole in the tensioner support
plate as shown in Figure 6.1A.
B. Remove temporarily installed M10-1.5 X
120mm screw and use to install the pre-
assembled spring tensioner into the upper
set of holes located on the front tensioner
plate. See Fig 5O.
Fig 6.1A
Fig 6.1B
FIXED
IDLER PULLEY
Fig 6.1C
6.1 BELT & DRIVE SYSTEM
INSTALLATION (SERPENTINE)
Advertising