Vortech Universal GM LSX Tuner Kits User Manual

Page 35

Advertising
background image

P/N: 4GE020-015 v1.0, 2010-05-24

©2010 Vortech Engineering, LLC

All Rights Reserved, Intl. Copr. Secured

25

Fig 6.1E

Fig 6.1D

Fig 6.1F

C. Using a ½” ratchet or breaker bar, de-tension

the spring tensioner and install the supplied

10-rib belt as follows:

i. Around the 10-rib crank pulley.

ii. Under the spring tensioner.

iii. Around the supercharger pulley.

iv. On top side of the fixed idler.

See Fig 6.1D, 6.1E, 6.1F.

Advertising