Vortech Universal GM LSX Tuner Kits User Manual
Page 39
Advertising
P/N: 4GE020-015 v1.0, 2010-05-24
©2010 Vortech Engineering, LLC
All Rights Reserved, Intl. Copr. Secured
29
K. Make sure the tensioner arbor is adjusted to
the highest position and install the supplied
cog belt around the crank first and then the
supercharger pulley.
L. With the belt routing underneath the tensioner
idler pulley, adjust the tensioner by turning the
tensioner screw counter-clockwise so that
idler pulley is lowered onto the belt applying
tension.
M. Once adequate tension is applied, lock the
tensioner in place by finally tightening the jam
nut on the tensioner arbor previously left
loose for adjustment purposes.
Fig 6.2J
Fig 6.2K
Advertising