Library, Drive, Sled – Dell TL2000 User Manual
Page 190: With, Springs, Shown), Components, Full-high, Fibre, Position

Tape
drive
sleds
are
installed
at
the
back
of
the
library.
1.
Power
OFF
the
library
before
removing
and/or
installing
a
SCSI
drive
sled.
Fibre
Channel
and
SAS
drive
sleds
are
hot
pluggable
and
may
be
removed
and
installed
while
the
library
is
powered
ON.
2.
If
necessary,
unload
the
tape
cartridge
from
the
drive
to
be
removed.
v
Using
the
Operator
Control
Panel:
Control
→
Move
Cartridges
v
Using
the
Web
User
Interface:
Manage
Library
→
Move
Media
3.
Remove
the
host
interface
cable
( 1 ,
2 ,
or
4
in
and
terminator
( 3
for
SCSI
drive
sled
only).
1
SCSI
cable
a77ug202
1
Figure
10-4.
Library
drive
sled
with
ESD
springs
[1]
(SAS
sled
shown)
a77ug204
1
3
4
2
5
6
10
7
8
9
7
Figure
10-5.
Drive
sled
components
(full-high
fibre
drive
in
top
position,
half-high
SCSI
drive
in
middle
position,
half-high
SAS
drive
in
bottom
position)
on
back
panel
of
a
4U
library
10-4
Dell
PowerVault
TL2000
Tape
Library
and
TL4000
Tape
Library
User's
Guide