Beisler 1225-4 User Manual

Page 31

Advertising
background image

2-5

1. Use the power cord located at the backside of the machine.

2. Plug it into a socket.

3. Lay the cord in a way, that the danger of stumbling is avoided.

Danger

Danger to life from unsufficient grounding! Do a grounding according to DIN
EN 60204-1.

2.4

First putting into operation

This machine has been configured to the individual requirements of the
customer. The first putting into operation can be done easily:

1. Adjust the machine to a horizontal stand.

2. Connect power and air supply.

3. Switch on the machine using the mains / emergency stop switch at the

front side of the machine.

4. Check all security systems for function and efficiency.

Danger

The machine may only be used for production purposes, after the security
systems have been checked. If a security doesn’t work adequately, it must be
repaired first.

As a factory setting, several production programs are contained in the buffer
of the machine. You may use one of them or create your own programs.