Put ting into ope ra ti on – Beisler 1265-5 User Manual

Page 74

Advertising
background image

6.

Put

ting into ope

ra

ti

on

6.1

Se

w ing test

A fter com pletion of the installation w ork a sew ing test should be m ade.

P lug in the m ains plug.

C aution: R isk of injury!

S w itch the m ain sw itch off.

Thread needle and hook thread only w ith the sew ing unit sw itched off.

Thread needle and hook thread
(see operating instructions of the sew ing m achine head).

S w itch the m ain sw itch on.
The control is initialized.

S elect the sew ing program .

For feeding and operating see part 1:
O perating instructions 1265/5

2

13

Advertising