2putting up – connection – setup – Beisler 1710-5 User Manual

Page 25

Advertising
background image

2-3

2

Putting up – Connection – Setup

ATTENTION

This machine may only be installed and put into operation by mechanically
and electrically qualified staff. This personell must read and understand the
complete Operating Instructions before.

2.1

Technical data

Dimensions

00 x 00 x 00 mm (LxWxH)

Table height

00 mm (adjustable)

Weight

00 kg

Electrical conn.

220 V AC

Power consumption

00 kW

Fuse

15 A

Compr. air conn.

min. 5 bar

Req. compr. air quality free of oil

Compr. air consumptionest. 00 NL/part

2.2

Mechanical Installation

ATTENTION

Check prior to the installation, whether the desired location corresponds with
the environmental requirements for the machine. Please see section ‘Technical
Data’ for further information.

2.2.1

Unpacking and Putting up

1. Remove the packing material and possible transportation lockings.

2. Position the machine on a horizontal grounding.

3. Level the machine with the adjustable feet to a horizontal stand.

Advertising